Adaptive Project Monitoring and Control with Variable Reviewing Intervals

نویسندگان

چکیده

This paper presents a managerial project control scheme in which the time between points is not fixed but instead function of distance planned and current performance levels. Varying reviewing interval improves efficiency monitoring process allows managers to obtain required information more quickly. To evaluate effectiveness proposed scheme, systematic computational experiment carried out. Besides, practical case study given illustrate applicability scheme. The results reveal satisfactory adaptive

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Performance of CCC-r control chart with variable sampling intervals

The CCC-r chart is developed based on cumulative count of a conforming (CCC) control chart that considers the cumulative number of items inspected until observing r nonconforming ones. Typically, the samples obtained from the process are analyzed through 100% inspection to exploit the CCC-r chart. However, considering the inspection cost and time would limit its implementation. In this paper, w...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

An exponentially weighted moving average scheme with variable sampling intervals for monitoring linear profiles

This paper proposes an exponentially weighted moving average scheme with variable sampling intervals for monitoring linear profiles. A computer program in Fortran is available to assist in the design of the control chart and the algorithm of the Fortran program is also given. Some useful guidelines are also provided to aid users in choosing parameters for a particular application. Simulation re...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

Variable Structure Control with Adaptive Fuzzy Sliding Surface

An adaptive fuzzy sliding mode control scheme is presented in this article. Despite the advantages of sliding mode control design for uncertain dynamic systems, classical sliding mode control has a major problem in the form of chattering, produced by the rapid switching used to conduct the state trajectories toward the sliding surfaces. A variety of methods are used to achieve chattering-free m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Innovation in Engineering

سال: 2021

ISSN: ['2783-1906']

DOI: https://doi.org/10.59615/ijie.1.4.34