Addressing Scheduling Software for Analyzing Delay Claim

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analyzing Delay Uncertainties: Statistical Delay Calculation

| This paper discusses a statistical approach to static timing analysis. Delays of gates and wires are modeled by stochastic values instead of the triple best case, typical and worst case delay. This has the advantage of avoiding the overly pessimistic (optimistic) outcome of traditional worst (best) case calculations. The paper proposes a new scheme to perform the delay calculations with stoch...

متن کامل

Analyzing Software Architectures for Modifiability

Several studies have shown that 50% to 70% of the total lifecycle cost for a software system is spent on evolving the system. Since incorporating anticipated changes generally requires considerably less effort than unanticipated changes, it is important to prepare a software system for likely changes during development. The software architecture plays an important role in achieving this, but fe...

متن کامل

Analyzing Specifications for Delay-Insensitive Circuits

We present the XDI Model for specifying delay-insensitive circuits, that is, reactive systems that correctly exchange signals with their environment in spite of unknown delays incurred by the interface. XDI specifications capture restrictions on the communication between circuit and environment, treating both parties equally. They can be visualized as state graphs where each arrow is labeled by...

متن کامل

Delay-Robust Event Scheduling

Robust optimisation is a well established concept to deal with uncertainty. In particular, recovery-robust models are suitable for real-world contexts, where a certain amount of recovery – although limited – is often available. In this paper we describe a general framework to optimise event-based problems against delay propagation. We also present a real-world application to train platforming i...

متن کامل

Analyzing scheduling with transient failures

When using thousands of processors simultaneously, the application developer can no longer assume that the computing platform is failure free. The probability that one of the computing processors crashes drastically increases with the number of processors [9]. Safety issues not only occur in large scale computing platforms but also in some real-time embedded systems [2]. There exist a lot of sa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering and Technology

سال: 2012

ISSN: 1793-8236

DOI: 10.7763/ijet.2012.v4.413