Advanced System Identification for High-Rise Building Using Shear-Bending Model
نویسندگان
چکیده
منابع مشابه
Advanced System Identification for High-Rise Building Using Shear-Bending Model
In order to identify physical model parameters of a high-rise building, a new story stiffness identification method is presented based on a shear-bending model and the identification function. Although a shear building model may be the simplest conventional model for representing tall buildings, the system identification (SI) method using that model is not necessarily appropriate. This is becau...
متن کاملReliability of System Identification Technique in Super High-Rise Building
A smart physical-parameter-based system identification (SI) method has been proposed in the previous paper (Ikeda et al., 2014a). This method deals with time-variant nonparametric identification of natural frequencies and modal damping ratios using AutoRegressive eXogenous (ARX) models and has been applied to high-rise buildings during the 2011 off the Pacific coast of Tohoku earthquake. In thi...
متن کامل1 Hybrid Damping System for High - Rise Building Outriggers
Recent design of buildings utilizes different strategies to mitigate the lateral displacement and acceleration from wind and earthquake excitation. One of the strategies is to dissipate external energy with dampers. For high-rise buildings, outrigger systems which connect the core and perimeter columns are innovative system, which to combine stiffness of both the core and perimeter columns to r...
متن کاملScheduling for High-rise Building Construction Using Simulation Techniques
High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...
متن کاملPrediction Model for Hoisting Time Using Luffing-type Crane for High-rise Building Construction
Hoisting planning for systematic and efficient vertical transportation is one of the key factors for successful completion in high-rise building construction. However, despite this importance, minimal research has been carried out for predicting hoist time, which is a key player in hoisting planning. Therefore, this study proposed a prediction model for vertical hoisting time using a luffing-ty...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Frontiers in Built Environment
سال: 2016
ISSN: 2297-3362
DOI: 10.3389/fbuil.2016.00029