Aggregated Risk Assessment and Survey for Risk Reduction in Oil Terminals

نویسندگان

چکیده

One of the goals any oil terminal is to make a business while avoiding hazardous events and harmful effects for both humans environment. This can be achieved by creating safe working place as well performing acceptable activities regarding impact on surrounding objects, including residential industrial areas. The aim hazard analysis assess risks related or phenomena evaluate whether assessed are acceptable. assessment risk also used reduction examining limiting scenarios that, instance, involve loss-of-containment flammable combustible material. In this paper, authors contribute research providing comprehensive methodology terminals with case study results discussion features methodology, aggregation, its applicability reduction, interests. performed considered “Klaipedos Nafta AB” (an operator Klaipeda Oil Terminal, Lithuania) materials that might released from various tanks, devices, associated pipelines. quantitative has enabled determination probability releases would ignite and, cause explosion. study, estimate probability, i.e., frequency, possible consequences were evaluated, mitigation measures considered.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Breast cancer risk assessment and risk reduction.

Until recently, the primary message of breast health awareness programs was that early detection is a woman's best protection against breast cancer, because there was no way to prevent it. Currently, however, tamoxifen is approved for chemoprevention of breast cancer in high-risk women, and studies are underway evaluating other medications that may decrease breast cancer risk. Data have also be...

متن کامل

Risk Assessment of Investments with Fuzzy Efficiency Indicators for Oil and Gas Production Industry

In the process of investment decision making, next to financial indicators many other aspects of investment projects are increasingly often considered. This leads to the multi-criteria evaluation of a project. The advantage of multi-criteria methods is the ability to take into account all (not only financial) aspects of the attractiveness of an investment project. The selection of criteria of p...

متن کامل

EMRAgis - Analytical Risk Assessment Tool for Community Risk Reduction

EMRAgis is a modern risk assessment tool. It is developed as an innovative fire prevention strategy for “Community risk reduction” (CCR) in Germany. The primary objective is to deal the assessment of personnel and material requirements of the local fire services based on reproducible empirical mathematical algorithm. These algorithms quantify the risk in a municipal area of discretion and deriv...

متن کامل

Farmer risk assessment for voluntary insecticide reduction

We develop a theoretical basis for voluntary reduction in insecticide use, and quantify the subjective value farmers place on reducing environmental risk. The indirect utility model is used to quantify the acceptable financial cost of eliminating one insecticide application in return for avoidance of moderate risk to the environment. The mean valuation in Illinois, Iowa, Nebraska and Ohio, USA,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2021

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su132112169