An accelerated MIP model for the single machine scheduling with preventive maintenance
نویسندگان
چکیده
منابع مشابه
JIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملIntegrated production and preventive maintenance scheduling for a single machine with failure uncertainty
Article history: Received 27 June 2012 Received in revised form 4 September 2014 Accepted 11 December 2014 Available online 20 December 2014
متن کاملa heuristic algorithm for solving single machine scheduling problem with periodic maintenance
in this paper, the scheduling problem with nonresumable jobs and maintenance process is considered in order to minimize the makespan under two alternative strategies. the first strategy is to implement the maintenance process on the machine after a predetermined time period and the second one is to consider the maximum number of jobs that can be done with a special tool. we have proposed a new ...
متن کاملGenetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
Despite the inter-dependent relationship between them, production scheduling and preventive maintenance planning decisions are generally analyzed and executed independently in real manufacturing systems. This practice is also found in the majority of the studies found in the relevant literature. In this paper, heuristics based on genetic algorithms are developed to solve an integrated optimizat...
متن کاملAn integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system
Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2016
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2016.07.915