An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria
نویسندگان
چکیده
منابع مشابه
An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria
To the best of our knowledge, this paper describes the first ant colony optimization (ACO) approach applied to nurse scheduling, analyzing a dynamic regional problem which is currently under discussion at the Vienna hospital compound. Each day, pool nurses have to be assigned for the following days to public hospitals while taking into account a variety of soft and hard constraints regarding wo...
متن کاملAn ACO algorithm for one-dimensional cutting stock problem
The one-dimensional cutting stock problem, has so many applications in lots of industrial processes and during the past few years has attracted so many researchers’ attention all over the world. In this paper a meta-heuristic method based on ACO is presented to solve this problem. In this algorithm, based on designed probabilistic laws, artificial ants do select various cuts and then select the...
متن کاملAn indirect Genetic Algorithm for a nurse-scheduling problem
This paper describes a Genetic Algorithms approach to a manpower-scheduling problem arising at a major UK hospital. Although Genetic Algorithms have been successfully used for similar problems in the past, they always had to overcome the limitations of the classical Genetic Algorithms paradigm in handling the conflict between objectives and constraints. The approach taken here is to use an indi...
متن کاملMaximizing the nurses’ preferences in nurse scheduling problem: mathematical modeling and a meta-heuristic algorithm
The nurse scheduling problem (NSP) has received a great amount of attention in recent years. In the NSP, the goal is to assign shifts to the nurses in order to satisfy the hospital’s demand during the planning horizon by considering different objective functions. In this research, we focus on maximizing the nurses’ preferences for working shifts and weekends off by considering several important...
متن کاملAn Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Operations Research
سال: 2007
ISSN: 0305-0548
DOI: 10.1016/j.cor.2005.03.018