An algorithm for closed-loop data-driven simulation

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Closed-loop data-driven simulation

Taylor & Francis makes every effort to ensure the accuracy of all the information (the “Content”) contained in the publications on our platform. However, Taylor & Francis, our agents, and our licensors make no representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the Content. Any opinions and views expressed in this publication are the opin...

متن کامل

Data-based Closed-loop System Simulation

This paper provides a framework for control design and simulation of a closed-loop system with partial input/output data of a plant. Given the input/output crosscorrelation and output autocorrelation data of an open loop dynamic system, a simulation model implemented in fixed-point digital devices which matches these data is obtained using q-Markov Covariance Equivalent Realizations. These resu...

متن کامل

An efficient Imperialistic Competitive Algorithm for the closed-loop supply chains considering pricing for product, and fleet of heterogeneous vehicles

 This paper investigates a pricing multi-period, closed-loop supply chains (CLSCs) with two echelons of producers and customers. Products are delivered to customers might be defective which are picked up and gathered in the collection center and will be fixed if it is possible and will be returned to the chain. Otherwise, they are sold as waste. This problem is determining price and distributio...

متن کامل

AN ALGORITHM FOR GOAL - DRIVEN SIMULATION Michel

This paper addresses the problem of goal-driven simulation. Goal-driven simulation is a task frequently performed by users of simulation systems. It consists in determining, when possible, an assignment of one or several decision variable(s) in order to obtain a particular value for a specific goal variable. This task is poorly supported in simulation systems because of lack of appropriate algo...

متن کامل

Benders decomposition algorithm for a green closed-loop supply chain under a build-to-order environment

Nowadays, researches pay more attention to environmental concerns consisted of various communities. This study proposes a multi-echelon, multi-period closed-loop supply chain (CLSC). A comprehensive model considers the selection of selection of technology and environmental effects. The supply chain is under a build-to-order (BTO) environment. So, there is not a final product inventory. Also, th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC Proceedings Volumes

سال: 2009

ISSN: 1474-6670

DOI: 10.3182/20090706-3-fr-2004.00018