An Effective Parallelism Topology in Ant Colony Optimization algorithm for Medical Image Edge Detection with Critical Path Methodology (PACO-CPM)
نویسندگان
چکیده
منابع مشابه
An Effective Parallelism Topology in Ant Colony Optimization algorithm for Medical Image Edge Detection with Critical Path Methodology (PACO-CPM)
In the digital world of medical transcription involving various dimensions of processes, detecting the edge of a standard medical image for clinical research/diagnosis, telemedicine and other applicative purposes requires various efficient and effective methodologies to address the needs of the processes. Among these various meta-heuristics, as the size of the problem tends to increase along wi...
متن کاملNoisy images edge detection: Ant colony optimization algorithm
The edges of an image define the image boundary. When the image is noisy, it does not become easy to identify the edges. Therefore, a method requests to be developed that can identify edges clearly in a noisy image. Many methods have been proposed earlier using filters, transforms and wavelets with Ant colony optimization (ACO) that detect edges. We here used ACO for edge detection of noisy ima...
متن کاملImage Edge Detection Based on Ant Colony Optimization Algorithm
No part of this journal may be reproduced or used in any form or by any means without written permission from the publisher, except for noncommercial, educational use including classroom teaching purposes. Product or company names used in this journal are for identification purposes only. Inclusion of the names of the products or companies does not indicate a claim of ownership by IGI Global of...
متن کاملnoisy images edge detection: ant colony optimization algorithm
the edges of an image define the image boundary. when the image is noisy, it does not become easy to identify the edges. therefore, a method requests to be developed that can identify edges clearly in a noisy image. many methods have been proposed earlier using filters, transforms and wavelets with ant colony optimization (aco) that detect edges. we here used aco for edge detection of noisy ima...
متن کاملAn Ant Colony Optimization Algorithm for Network Vulnerability Analysis
Intruders often combine exploits against multiple vulnerabilities in order to break into the system. Each attack scenario is a sequence of exploits launched by an intruder that leads to an undesirable state such as access to a database, service disruption, etc. The collection of possible attack scenarios in a computer network can be represented by a directed graph, called network attack gra...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Recent Contributions from Engineering, Science & IT (iJES)
سال: 2015
ISSN: 2197-8581
DOI: 10.3991/ijes.v3i4.5139