An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ordinal Optimization-Based Multi-energy System Scheduling for Building Energy Saving

Buildings contribute a significant part in the energy consumption and CO2 emission in many developed and developing countries. Building energy saving has thus become a hot research topic recently. The technology advances in power co-generation, on-site generation, and storage devices bring us the opportunity to reduce the cost and CO2 emission while meeting the demand in buildings. A fundamenta...

متن کامل

An Online Energy Saving Resource Optimization Methodology for Data Center

In order to reduce energy consumption of data centers while employing infrastructure resource effectively, a comprehensive resource management method using an improved online energy saving mapping algorithm for virtual machines of data centers is proposed. An intelligent feedback management framework is built for online resource optimization. We propose reinforcement learning and threshold base...

متن کامل

An Optimization of Energy Saving in Cloud Environment

Cloud computing is a technology in distributed computing which facilitates pay per model based on user demand and requirement. Cloud can be defined as a collection of virtual machines. This includes both computational and storage facility. The goal of cloud computing is to provide efficient access to remote and geographically distributed resources. Cloud Computing is developing day by day and f...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energies

سال: 2018

ISSN: 1996-1073

DOI: 10.3390/en11051261