An Enhanced Genetic Algorithm to Solve the Static and Multistage Transmission Network Expansion Planning

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Return on Investment in Transmission Network Expansion Planning Considering Wind Generation Uncertainties Applying Non-dominated Sorting Genetic Algorithm

Although significant private investment is absorbed in different sectors of power systems, transmission sector is still suffering from appropriate private investment. This is because of the pricing policies of transmission services, tariffs, and especially for investment risks. Investment risks are due to the uncertain behaviour of power systems that discourage investors to invest in the transm...

متن کامل

Transmission Expansion Planning Considering Network Adequacy and Investment Cost Limitation using Genetic Algorithm

In this research, STNEP is being studied considering network adequacy and limitation of investment cost by decimal codification genetic algorithm (DCGA). The goal is obtaining the maximum of network adequacy with lowest expansion cost for a specific investment. Finally, the proposed idea is applied to the Garvers 6-bus network. The results show that considering the network adequacy for solution...

متن کامل

An Efficient Genetic Algorithm to Solve the Intermodal Terminal Location problem

The exponential growth of the flow of goods and passengers, fragility of certain products and the need for the optimization of transport costs impose on carriers to use more and more multimodal transport. In addition, the need for intermodal transport policy has been strongly driven by environmental concerns and to benefit from the combination of different modes of transport to cope with the in...

متن کامل

A New Generation Allocation and Expansion Planning Algorithm Including Transmission System Effects

Generation Expansion Planning (GEP) is one of major modules of power system planning studies, normally performed for the nex 10-30 years horizon. The current industrial practices are to find the generation requirements based on a nodal analysis. In this way, the allocations are not determined and subequent studies are required to find the exact locations which as decomposed from the earli...

متن کامل

An Algorithm to Compute the Complexity of a Static Production Planning (RESEARCH NOTE)

Complexity is one of the most important issues of any production planning. The increase in complexity of production planning can cause inconsistency between a production plan and an actual outcome. The complexity generally can be divided in two categories, the static complexity and the dynamic complexity, which can be computed using the ant ropy formula. The formula considers the probability of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Electrical and Computer Engineering

سال: 2012

ISSN: 2090-0147,2090-0155

DOI: 10.1155/2012/781041