The bus line planning problem or transit network design with integrated passenger routing is a challenging combinatorial problem. Although well-known benchmark instances for this have been available decades, the state of art lacks optimal solutions these instances. branch and bound algorithm, presented in paper, introduces three novel concepts to determine solutions: (1) new pool generation method based on dominance, (2) introduction essential links, i.e., links which can be determined beforehand must present solution, (3) representation adding only extra edges. Next presenting newly obtained solutions, each abovementioned examined isolation experiments, it shown that they contribute significantly success algorithm.
منابع مشابه
A Direct Connection Approach to Integrated Line Planning and Passenger Routing
The treatment of transfers is a major challenge in line planning. Existing models either route passengers and lines sequentially, and hence disregard essential degrees of freedom, or they are of extremely large scale, and seem to be computationally intractable. We propose a novel direct connection approach that allows an integrated optimization of line and passenger routing, including accurate ...
متن کاملPassenger Focused Shuttle Bus Planning
Passengers experience significant inconvenience from track closures required for planned maintenance and infrastructure updates of rail networks. Generally, operators restore connectivity with shuttle busses replacing the closed link in the network. This however introduces additional transfers, while the speed of travel on busses for the replaced links is generally lower than the speed of the p...
متن کاملAn Exact Solution Approach for the Airport Stand Allocation Problem
Every day planners and dispatcher in airports deal with different decisions related to the movement of aircraft. These decisions usually involve the use of fixed resources like runways, stands (parking positions), and passenger gates. Due to the increasing flow of passengers, these resources are becoming scarce and some airports have experimented a degradation of the services offered. One clear...
متن کاملAn exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
The purpose of this work is to efficiently design disassembly lines taking into account the uncertainty of task processing times. The main contribution of the paper is the development of a decision tool that allows decision makers to choose the best disassembly alternative (process), for an End of Life product (EOL), and assign the corresponding disassembly tasks to the workstations of the line...
متن کاملModel and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand
The capacitated arc routing problem (CARP) is one of the most important routing problems with many applications in real world situations. In some real applications such as urban waste collection and etc., decision makers have to consider more than one objective and investigate the problem under uncertain situations where required edges have demand for more than one type of commodity. So, in thi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Advanced Transportation
سال: 2021
ISSN: ['0197-6729', '2042-3195']
DOI: https://doi.org/10.1155/2021/6684795