An improved approximation algorithm for the two-machine open shop scheduling problem with family setup times
نویسندگان
چکیده
منابع مشابه
Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملAn improved approximation algorithm for two-machine flow shop scheduling with an availability constraint
We study the problem of scheduling n jobs in a two-machine flow shop where the second machine is not available for processing during a given time interval. A resumable scenario is assumed, i.e if a job cannot be finished before the down period it is continued after the machine becomes available again. The objective is to minimize the makespan. The best fast approximation algorithm for this prob...
متن کاملAn optimal online algorithm for two-machine open shop preemptive scheduling with bounded processing times
This paper deals with a two-machine open shop scheduling problem. The objective is to minimize the makespan. Jobs arrive over time. We study preemptionresume model, i.e., the currently processed job may be preempted at any moment in necessary and be resumed some time later. Let p1, j and p2, j denote the processing time of a job J j on the two machines M1 and M2, respectively. Bounded processin...
متن کاملThe Job-shop Scheduling Problem the Job-shop Scheduling Problem with Setup Times
This paper reports a bibliographical study and some personnal works about the general Jobshop Problem and Jobshop Problems with setup times. Section 1 introduces some { usual { notations about the general problem. Speciic notations concerning with setup times will be introduced later. The bibliograacal study, in Section 2 focuses on recent papers on both problems. Section 3 presents a general s...
متن کاملOne-Operator, Two-Machine Open Shop and Flow Shop Scheduling with Setup Times for Machines and Maximum Lateness Objective
This paper considers a scheduling problem in which a single operator completes a set of n jobs requiring operations on two machines. The operator can perform only one operation at a time, so when one machine is in use the other is idle. After developing general properties of optimal schedules, the paper develops e cient algorithms for minimizing maximum lateness. The algorithm has time complexi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IIE Transactions
سال: 2008
ISSN: 0740-817X,1545-8830
DOI: 10.1080/07408170701592473