An improved MIP-based approach for a multi-skill workforce scheduling problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An improved MIP-based approach for a multi-skill workforce scheduling problem

This paper deals with scheduling complex tasks with an inhomogeneous set of resources. The problem is to assign technicians to tasks with multi-level skill requirements. Here, the requirements are merely the presence of a set of technicians that possess the necessary capabilities. An additional complication is that a set of combined technicians stays together for the duration of a work day. Thi...

متن کامل

An improved MIP-based combinatorial approach for a multi-skill workforce scheduling problem

This paper deals with scheduling complex tasks with an inhomogeneous set of resources. The problem is to assign technicians to tasks with multi-level skill requirements. Here, the requirements are merely the presence of a set of technicians that possess the necessary capabilities. An additional complication is that a set of combined technicians stays together for the duration of a work day. Thi...

متن کامل

Column generation based approaches for a tour scheduling problem with a multi-skill heterogeneous workforce

In this paper, we address a multi-activity tour scheduling problem with time varying demand. The objective is to compute a team schedule for a fixed roster of employees in order to minimize the over-coverage and the undercoverage of different parallel activity demands along a planning horizon of one week. Numerous complicating constraints are present in our problem: all employees are different ...

متن کامل

A Reactive Approach for the Multi-Skill Project Scheduling Problem

This paper deals with the Multi-Skill Project Scheduling Problem (MSPSP) in case of disruptions. First, the problem is defined, then a way to build a first schedule is introduced and finally the reactive approach used to repare the schedule is presented.

متن کامل

Attaining stability in multi-skill workforce scheduling

In this paper, we define a set inequalities that are satisfied by stable multi-skill workforce schedules. In our analysis, a schedule is said to be stable if it does not contain a blocking pair, extending the notion of blocking pair in the Marriage Model of Gale-Shapley. Skill efficiency is chosen as the criterion in the preference structure. The proposed algorithm either constructs a stable mu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Scheduling

سال: 2011

ISSN: 1094-6136,1099-1425

DOI: 10.1007/s10951-011-0245-x