AN INTEGER RESOURCE ALLOCATION PROBLEM WITH COST CONSTRAINT

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Resource Allocation/Scheduling Problems with Constraint Integer Programming

Constraint Integer Programming (CIP) is a generalization of mixed-integer programming (MIP) in the direction of constraint programming (CP) allowing the inference techniques that have traditionally been the core of CP to be integrated with the problem solving techniques that form the core of complete MIP solvers. In this paper, we investigate the application of CIP to scheduling problems that r...

متن کامل

OPTIMAL RESOURCE ALLOCATION IN DEA WITH INTEGER VARIABLES

Resource allocation and optimal leveling are among the top challenges in project management. This paper presents a DEA-based procedure for determining an optimal level of inputs to produce a fixed level of outputs. To achieve this goal, we assume that the levels of outputs can be forecasted in the next season and the procedure will determine optimal level of inputs for all DMUs. Such as some of...

متن کامل

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

optimal resource allocation in dea with integer variables

resource allocation and optimal leveling are among the top challenges in project management. this paper presents a dea-based procedure for determining an optimal level of inputs to produce a fixed level of outputs. to achieve this goal, we assume that the levels of outputs can be forecasted in the next season and the procedure will determine optimal level of inputs for all dmus. such as some of...

متن کامل

an effective method for simultaneously considering time-cost trade-off and constraint resource scheduling using nonlinear integer framework

critical path method (cpm) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. despite its popularity, cpm has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. the analytical competency and computing capability of cpm thus...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operations Research Society of Japan

سال: 1998

ISSN: 0453-4514,2188-8299

DOI: 10.15807/jorsj.41.470