AN INTEGRATED FRAMEWORK FOR REDUCING PRECAST FABRICATION INVENTORY

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Construction Management System for Site Precast Concrete

In order to manage site precast concrete construction which has been increasing, an integrated construction management system employing a unique 3-D modelling method and analogue process input method was developed. At the planning stage, the system supports interactive planning between member configuration and installation planning by a visual method and with an accurate quantity. At the proces...

متن کامل

an investigation about the appropriate stochastic modeling framework for agricultural insurance pricing

با توجه به اینکه بیمه محصولات کشاورزی در ایران بیشتر جنبه ای حمایتی دارد و خسارات گزارش شده عموما بیش از حق بیمه های دریافت شده است، در این پایان نامه به جهت تعیین قیمت بیمه محصولات کشاورزی (گندم دیم) از فرآیندهای نوفه شلیک به عنوان مدلی مناسب استفاده شده است. بر اساس داده های صندوق بیمه کشاورزی از خسارات اعلام شده در سال زراعی 1388-1389 گندم دیم، در این پایان نامه حق بیمه خالص و ناخالص این محص...

An integrated model for solving the multiple criteria ABC inventory classification problem

In this paper, we present an integrated version of the Ng model and Zhou and Fan model [W. L. Ng,A simple classifier for multiple criteria ABC analysis, European Journal of Operation Research, 177(2007) 344-353; P. Zhou & L. Fan, A note on multi-criteria ABC inventory classification usingweighted linear optimization, European Journal of Operation Research, 182 (2007) 1488-1491]. Themodel that N...

متن کامل

An Integrated Production-Inventory Model with Backorder and Lot for Lot Policy

    inventory model,   backorder   buyer ,   vendor,   lot for lot policy In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis...

متن کامل

An Integrated Human Resource Planning Framework for Project-based Organizations in Oil and Gas Industry

The complexities of the oil industry, combined project-based organizations’ complexities, have led the traditional planning of HR being failed. The success of these organizations is based on integrative human resource planning. To this end, the purpose of this study was to determine the factors and components of human resource planning in oil and gas project-based organizations and providing an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT

سال: 2010

ISSN: 1392-3730,1822-3605

DOI: 10.3846/jcem.2010.48