An Integrated Framework for Risk Response Planning Under Resource Constraints in Large Engineering Projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

An Integrated Human Resource Planning Framework for Project-based Organizations in Oil and Gas Industry

The complexities of the oil industry, combined project-based organizations’ complexities, have led the traditional planning of HR being failed. The success of these organizations is based on integrative human resource planning. To this end, the purpose of this study was to determine the factors and components of human resource planning in oil and gas project-based organizations and providing an...

متن کامل

Planning under Resource Constraints

This paper outlines the basic principles underlying reasoning about resources in IPP, which is a classical planner based on planning graphs originally introduced with the graphplan system. The main idea is to deal with resources in a strictly action-centered way, i.e., one speciies how each action consumes or produces resources, but no explicit temporal model is used. This avoids the computatio...

متن کامل

a fuzzy decision-making methodology for risk response planning in large-scale projects

risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. the conventional approaches tend to be less effective in dealing with the impreciseness of risk response pl...

متن کامل

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Engineering Management

سال: 2013

ISSN: 0018-9391,1558-0040

DOI: 10.1109/tem.2013.2242078