An Integrated Scheduling Algorithm Based on a Process End Time-Driven and Long-Time Scheduling Strategy
نویسندگان
چکیده
The integrated scheduling problem is a classical combinatorial optimization problem. existing algorithms generally adopt the short-time strategy that does not fully consider impact of degree process parallelism on results. In order to further optimize total processing time product and utilization rate device, an algorithm based end time-driven long-time proposed. proposed sets up separate candidate queue for each device determines premise satisfying constraint conditions tree. Driven by time, finds schedulable processes device. If unique, it scheduled. Otherwise, if with long-path particular, strategies queues different devices are symmetric, relationships between in asymmetric. case analysis results show better than some terms average devices. Therefore, provides new idea single complex product.
منابع مشابه
An Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm
This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is...
متن کاملIntegrated Control and Real-Time Scheduling Integrated Control and Real-Time Scheduling
The topic of the thesis is codesign of flexible real-time control systems. Integrating control theory and real-time scheduling theory, it is possible to achieve higher resource utilization and better control performance. The integration requires new tools for analysis, design, and implementation. The problem of scheduling the individual parts of a control algorithm is studied. It is shown how s...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملAn effective hybrid algorithm for integrated process planning and scheduling
Process planning and scheduling are two of the most important functions in the manufacturing system. Traditionally, process planning and scheduling were regarded as separate tasks performed sequentially, where scheduling was implemented after process plans had been generated. However, their functions are usually complementary. If the two systems can be integrated more tightly, greater performan...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Symmetry
سال: 2022
ISSN: ['0865-4824', '2226-1877']
DOI: https://doi.org/10.3390/sym14102106