An Optimal Policy for the Capacitated Lot Sizing Problem with financing of the Working Capital Requirement

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Three Meta-heuristic Algorithms for the Single-item Capacitated Lot-sizing Problem (RESEARCH NOTE)

This paper proposes a mixed integer programming model for single-item capacitated lot-sizing problem with setup times, safety stock, demand shortages, outsourcing and inventory capacity. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA), vibration damping optimization (VDO) and harmony search (HS) have been used to solve this model. Additionally, ...

متن کامل

Parallel Genetic Algorithm for the Capacitated Lot-Sizing Problem

A parallel genetic algorithm is presented to solve the well-known ca-pacitated lot-sizing problem. The approach is implemented on a massively parallel single instruction multiple data architecture with 16384 4-bit processors. Based on a random keys representation a schedule is backward oriented obtained which enables us to apply a very simple capacity check. Genetic algorithms are a general pur...

متن کامل

An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times

This paper considers the capacitated multi-level lot-sizing problem with setup times, a class of difficult problems often faced in practical production planning settings. In the literature, relax-and-fix is a technique commonly applied to solve this problem due to the fact that setup decisions in later periods of the planning horizon are sensitive to setup decisions in the early periods but not...

متن کامل

An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups

This paper presents a novel mathematical programming approach to the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and setup costs. The approach is partly based on the earlier work of Haase and Kimms [2000. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of ...

متن کامل

A Capacitated Lot Sizing Problem with Stochastic Setup Times

In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times (CLSP-SST).We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SST is formulated as a two-stage stochastic programming problem. A procedure is proposed to effe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2019

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2019.11.321