An uncertain model for RCPSP with solution robustness focusing on logistics project schedule
نویسندگان
چکیده
منابع مشابه
Integrated Analytical Model for Relief Logistics in Uncertain Conditions
The life of many people in the world is under the danger because of the accidents and unpredicted diseases, which require relief. Since, most of such cases occur in unpredictable condition, for an appropriate planning, the uncertain conditions should be investigated. Consequently, this paper investigates the integrated and multi-step process of locating, assigning and routing the air and la...
متن کاملChance-Constrained Model for RCPSP with Uncertain Durations
Project scheduling with uncertain durations becomes a research focus with the development of uncertainty theory. Most researches concerned aim at minimizing project makespan or project cost according to different decision criterions. However, few works considered resource constraint, which initially appeared in deterministic resource-constrained project scheduling problem (RCPSP) and reflects t...
متن کاملIntegrated Analytical Model for Relief Logistics in Uncertain Conditions
The life of many people in the world is under the danger because of the accidents and unpredicted diseases, which require relief. Since, most of such cases occur in unpredictable condition, for an appropriate planning, the uncertain conditions should be investigated. Consequently, this paper investigates the integrated and multi-step process of locating, assigning and routing the air and la...
متن کاملCommunity Cloud: an Infrastructure Solution for a Logistics Project
Cloud computing is becoming more and more adopted as infrastructure for providing service oriented solutions. Such a solution is especially critical when software and hardware resources are remotely distributed. In this paper we illustrate our experience in designing the architecture of a community cloud infrastructure in an industrial project related to integrated logistics (LOGIN) for made in...
متن کاملA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of e-Navigation and Maritime Economy
سال: 2015
ISSN: 2405-5352
DOI: 10.1016/j.enavi.2015.12.007