An Uncertain Programming for the Integrated Planning of Production and Transportation

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated production/transportation planning decisions using possi- bilistic linear programming

This study develops an interactive possibilistic linear programming (PLP) method for solving the integrated production/transportation planning decision (PTPD) problem with imprecise objective and constraints in an uncertain environment. The proposed PLP method attempts to minimize the total net costs with reference to available supply, machine capacity, labor level and budget constraints at eac...

متن کامل

‏‎faciliting lexical access for the fluent production of speech‎‏

‏‎the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis,a one-way anova experimental design was carried out. 24 sednior students of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inter...

15 صفحه اول

‏‎facilitating lexical access for the fluent production of speech‎‏

‏‎the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis , a one- way anova experimental design was carried out. 24 senior student of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inte...

15 صفحه اول

An integrated production-marketing planning model With Cubic production cost function and imperfect production process

The basic assumption in the traditional inventory model is that all outputs are perfect items. However, this assumption is too simplistic in the most real-life situations due to a natural phenomenon in a production process. From this it is deduced that the system produces non-perfects items which can be classified into four groups of perfect, imperfect, reworkable defective and non-reworkable d...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2014

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2014/419358