ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PADA PROYEK PEMBANGUNAN APARTEMEN URBAN SIGNATURE CIRACAS

نویسندگان

چکیده

The delay in completion of construction that has exceeded the work time target according to initial agreement is very powerful on project itself. Delays occur due problems arise terms materials, labor, costs, equipment, environment, and others. In this research, an analysis was carried out what factors were cause superstructure rating value reliability function each work. Fault Tree Analysis (FTA) approach would be employed, which a method makes use fault tree form graphic model based outcomes conducted interviews. model, there several event symbols logic gate connect symbols. On simplest cut set acquired using Boolean algebra Method Obtain Cut Set (MOCUS). Based results analysis, 33 basic events or jobs experienced delays, including changes rebar supply by Owner, limited human resources, lot repair work, evaluation schedule, SILO SIO PH licensing, late payments, delays material delivery, Typical structural ladder structures, law can applied because it repeating code. Meanwhile, roof engine room, cannot since does not have calculated follows. When all three variables are accurate, system operates as intended.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Evaluation Method Based on Matter-Element and Hierarchy Model

Abstrak Evaluasi proyek selalu menjadi kunci dari manajemen proyek rekayasa. Evaluasi proyek adalah pekerjaan yang kompleks yang melibatkan banyak faktor. Hasil evaluasi akhir selalu dipengaruhi langsung oleh definisi indeks evaluasi yang bervariasi dan bobot yang terkait. Makalah ini terutama mempelajari penilaian kemampuan para ahli dan pembentukan sistem evaluasi proyek indeks dalam tinjauan...

متن کامل

Simple ROI untuk justifikasi investasi proyek Data Warehouse pada perguruan tinggi swasta

Decreasing new students for private high education push the management particularly for high level management for making an information which can help them to make decisions in order for competition with other high educations. One of way out by building with information technology approaching like data warehouse for data handling and making the best decisions. Simple ROI is used for project jus...

متن کامل

E-Monitoring Program Pembangunan Infrastruktur Perdesaan (PPIP) pada Dinas PU Cipta Karya dan Pengairan Kabupaten Muba

Information technology is widely used as a media monitor various activities. In this study, the authors will utilize IT to monitor the Rural Infrastructure Development Program (PPIP). PPIP is a program of community development at the village level in the framework of the provision of basic infrastructure in rural settlements carried out by the Directorate General of Human Settlements Ministry o...

متن کامل

Sistem penunjang keputusan kelayakan pemberian pinjaman dengna metode fuzzy tsukamoto

Abstrak – Sistem penunjang keputusan (SPK) dapat digunakan untuk membantu penyelesaikan permasalahan atau pengambilan keputusan yang bersifat semi terstruktur atau terstruktur. Metode yang digunakan adalah Fuzzy Tsukamoto. PT Triprima Finance merupakan suatu perusahaan yang bergerak di bidang jasa peminjaman dengan jaminan berupa Buku Pemilik Kenderaan Bermotor atau mobil (BPKB). PT. Triprima F...

متن کامل

Frequency of thalassemia carrier and Hb variant and the quality of stored donor blood

Metode: Penelitian ini menggunakan disain potong lintang dengan sampel berasal dari 138 donor darah. Dilakukan skrining talasemia dan Hb varian pada keseluruhan sampel, yang meliputi pemeriksaan hitung sel darah lengkap, analisis Hb metode HPLC dan analisis DNA untuk deteksi pembawa sifat talasemia α. Uji kualitas darah simpan dilakukan melalui penghitungan persen hemolisis sel darah merah pada...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Construction And Material Journal

سال: 2023

ISSN: ['2655-9625']

DOI: https://doi.org/10.32722/cmj.v5i1.4703