Analisis Kelayakan CVT (Capacitive Voltage Transformer) Phasa S Bay Busbar 2 150 kV di GI PT. XYZ Indonesia
نویسندگان
چکیده
منابع مشابه
Measurement Error Estimation for Capacitive Voltage Transformer by Insulation Parameters
Measurement errors of a capacitive voltage transformer (CVT) are relevant to its equivalent parameters for which its capacitive divider contributes the most. In daily operation, dielectric aging, moisture, dielectric breakdown, etc., it will exert mixing effects on a capacitive divider’s insulation characteristics, leading to fluctuation in equivalent parameters which result in the measurement ...
متن کاملElectric and Magnetic Field Computation of 35 Kv Voltage Level of Transformer Substation 35/10 Kv Using the Cdegs Software
Paper presents electric and magnetic field computation of 35 kV voltage level of transformer substation 35/10 kV using CDEGS software. Based on well known theoretical considerations of electric and magnetic fields, a realistic simulation model of transformer station 35/10 kV was develop. All calculations are made for horizontal plane with height of 1,5 m above the soil changing coordinates alon...
متن کاملTidal Power in the Klabat Bay, Indonesia
The design of complex technological systemsrequired an early outlook of institutional issues. Thepaper suggests a design methodology to combineinstitutional design and engineering design. Thedesign methodology is applied to a case study of tidalpower development in the Klabat bay, Indonesia. Inthe case study it is shown that there are interactionsbetween institutiona...
متن کاملSistem penunjang keputusan kelayakan pemberian pinjaman dengna metode fuzzy tsukamoto
Abstrak – Sistem penunjang keputusan (SPK) dapat digunakan untuk membantu penyelesaikan permasalahan atau pengambilan keputusan yang bersifat semi terstruktur atau terstruktur. Metode yang digunakan adalah Fuzzy Tsukamoto. PT Triprima Finance merupakan suatu perusahaan yang bergerak di bidang jasa peminjaman dengan jaminan berupa Buku Pemilik Kenderaan Bermotor atau mobil (BPKB). PT. Triprima F...
متن کاملTransformer voltage control and Tap changing
The voltage control is performed by changing the turns ratio. This is done by provision of taps in the winding. The volts per turn available in large transformers is quite high and hence a change of even one turn on the LV side represents a large percentage change in the voltage. Also the LV currents are normally too large to take out the tapping from the windings. LV winding being the inner wi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Techné : Jurnal Ilmiah Elektroteknika
سال: 2021
ISSN: 2615-7772,1412-8292
DOI: 10.31358/techne.v20i1.259