ANALISIS KINERJA PROYEK “Y”MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (Studi Kasus di PT Asian Sealand Engineering)

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analisis dan Perancangan Wireless Roaming (Studi Kasus Universitas Baturaja)

Wireless roaming is one way to improve the reliability of a network of hotspots that are still using the topology Basic Service Set (BSS). When the user walks away from one access point (AP) or one AP die then begins to lose the signal, the mobile station (MS) is automatically connected with the AP to another without reconfiguring. Devices that support wireless roaming is the AP TP-Link TL-WR74...

متن کامل

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

Value-based Software Engineering: a Case Study Using Earned Value

plex project. But it has absolutely nothing to say about the stakeholder value of the system the project is developing. It serves a purpose, but needs to be incorporated into feedback control systems that focus on the real stakeholder value being earned. The value-based software engineering agenda, described in the “Accounting for Value in Software Engineering” sidebar, seeks to integrate value...

متن کامل

Research on Optimization of Earned Value Management Method in Engineering Budget Management

Earned Value Management Method (EVM), widely used in the world, is a project management method of costschedule integrated control. But the traditional EVM sometimes cannot provide an accurate result. In this paper, a practical method is given to analyze the project performance, in which the Network Diagram Method and the Critical Path Method have been introduced into EVM system that can better ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF APPLIED BUSINESS ADMINISTRATION

سال: 2018

ISSN: 2548-9909

DOI: 10.30871/jaba.v2i1.784