ANALISIS RESOURCE LEVELING PADA TENAGA KERJA STUDI KASUS : PROYEK JLLB TAHAP2

نویسندگان

چکیده

The West Ring Outer Line Project experienced delays in its implementation. One of the factors delay is inefficient allocation resources. Thus, research analyzes resources JLLB project to make it more efficient. Equitable distribution carried out by adjusting use labor according real conditions field. From analysis, there are 3 with first condition, namely planning condition which has a duration 262 days very significant fluctuations, as many 49 workers/day 3rd week May and 1 handyman/day 4th May, peak 63 craftsmen 70 available craftsmen. second that field obtained total 33 builders/day, so they have good third after leveling, number builders workers/day, shown at 38 weeks does not exceed craftsmen/day, this done based on data, theresults different before leveling out. With work being 17 slower, will be 279 days, starting from April 14, 2021 January 17, 2022. three conditions, concluded each data disparity.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analisis dan Perancangan Wireless Roaming (Studi Kasus Universitas Baturaja)

Wireless roaming is one way to improve the reliability of a network of hotspots that are still using the topology Basic Service Set (BSS). When the user walks away from one access point (AP) or one AP die then begins to lose the signal, the mobile station (MS) is automatically connected with the AP to another without reconfiguring. Devices that support wireless roaming is the AP TP-Link TL-WR74...

متن کامل

T-lineage blast crisis of chronic myelogenous leukemia: simple record of 4 cases

Krisis blastik pada lekemia mielositik kronik (CML) bisa berasal dari lini granulosit, monosit, eritrosit, limfoid (sel B atau sel T), dan megakariositik. Krisis blastik seri limfoid biasanya berupa sel B dengan fenotipik sel Pre-B, di mana Ig permukaan belum diekspresikan. Krisis blastik dari sel T sangat jarang didapatkan. Tujuan penelitian : mendeskripsikan gambaran fenotipik, transkrip fusi...

متن کامل

Simple ROI untuk justifikasi investasi proyek Data Warehouse pada perguruan tinggi swasta

Decreasing new students for private high education push the management particularly for high level management for making an information which can help them to make decisions in order for competition with other high educations. One of way out by building with information technology approaching like data warehouse for data handling and making the best decisions. Simple ROI is used for project jus...

متن کامل

Sistem Informasi Penjualan Dan Perbaikan Komputer (Studi Kasus: CV Computer Plus Palembang)

s: The purpose of this research is to develop an Information System of Selling and Services using Microsoft Visual Basic and Microsoft Access for it database. The benefits of this research is to help CV Computer Plus in selling and services data processing everyday. To develop this IS is used 5 (five) steps: 1) Planning, 2) Analysis, 3) Design, 4) Implementation, and 5) Evaluation. The Informat...

متن کامل

The Development of Semantic Web to Search Student Final Study Collections (Work Practice and Final Project)

1. H. F. Gunawan, “Penerapan Web Semantik Untuk Aplikasi Pencarian Pada Repositori Koleksi Penelitian ,Studi Kasus : Program Studi Sistem Informasi Stmik Mikroskil Medan,” vol. 15, no. 1, pp. 51–60, 2014. 2. I. A. S. Wicaksono, N. Charibaldi, and H. Jayadianti, “Penerapan Teknologi Semantic Web untuk Menentukan Pilihan Jalur Bis Trans Jogja,” Semin. Nas. Inform. 2010 (semnasIF 2010), vol. 2010,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Ilmiah MITSU

سال: 2023

ISSN: ['2685-9173']

DOI: https://doi.org/10.24929/ft.v11i1.2077