Analysis and Design of a Project Portfolio Management System

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

langauge needs analysis of undergraduate business management and economics students

the aim of conducting this study was to investigate the foreign language learning needs of undergraduate economics students and business management students in faculties of social sciences of alzahra and azad naragh university. in the study, which was designed on the basis of a qualitative-quantitative basis using interviews and questionnaires, 146 female undergraduate business management as we...

15 صفحه اول

‏‎a phonological contrastive analysis of kurdish and english‎‏

deposite the different criticisms on contrastive analysis it has been proved that the results of it(when processed)can be usuful in a tefl environment,specially at the level of phonology.this study is an attempt to compare and contrast the sound systems of kurdish and english for pedagogical aims. the consonants,vowels,stress and intonation of the twolanguages are described by the same model-ta...

15 صفحه اول

simulation and design of electronic processing circuit for restaurants e-procurement system

the poor orientation of the restaurants toward the information technology has yet many unsolved issues in regards to the customers. one of these problems which lead the appeal list of later, and have a negative impact on the prestige of the restaurant is the case when the later does not respond on time to the customers’ needs, and which causes their dissatisfaction. this issue is really sensiti...

15 صفحه اول

a contrastive analysis of concord and head parameter in english and azerbaijani

این پایان نامه به بررسی و مقایسه دو موضوع مطابقه میان فعل و فاعل (از نظر شخص و مشار) و هسته عبارت در دو زبان انگلیسی و آذربایجانی می پردازد. اول رابطه دستوری مطابقه مورد بررسی قرار می گیرد. مطابقه به این معناست که فعل مفرد به همراه فاعل مفرد و فعل جمع به همراه فاعل جمع می آید. در انگلیسی تمام افعال، بجز فعل بودن (to be) از نظر شمار با فاعلشان فقط در سوم شخص مفرد و در زمان حال مطابقت نشان میدهند...

15 صفحه اول

The Project Portfolio Management Problem

We consider the Project Portfolio Management Problem (PPMP) in which a limited resource must be allocated among a set of candidate projects over time so as to maximize expected net present value. We formulate this problem as a dynamic program but conclude that this approach is too computationally complex to be of value in supporting real-world project management. So, we investigate the structur...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computer and Information Science

سال: 2019

ISSN: 1913-8997,1913-8989

DOI: 10.5539/cis.v12n3p42