Analysis of Time and Cost Control in a 2-Storey Construction Project Using the Earned Value Method (Case Study: Puri Cempaka Serang Housing Development Project)

نویسندگان

چکیده

Poor planning is a common factor in project delays. For this reason, time and cost analysis method needed which can examine how much deviation occurs the remaining costs to complete project. The purpose of research find out performance, what causes delays, estimated completion. management activities (Cost Management) (Time be This done by using one control methods, namely value concept results (Earned Value). Earned Value (EV) techniques for determining real advantages disadvantages projects provides means balance gains/losses maximize profits. Week 1 week 9 performance saves job fees. However, from 14th 20th experiencing expenditure greater than budget with CPI 0,748 faster. But 13 week, 20 slower an SPI 0,59. result calculation completing Rp. 5.245.556.910 turnaround 41 weeks, showing was 17 weeks late planned 24 weeks. Causative delays are work drawings or shop that coming as well their gradual submission, lack fill land, workers getting portion Eid holiday ± month.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

applying forecasting models through estimate at completion cost of project in using earned value analysis

earned value management (evm) is the process of integrating the time and cost management within the framework of project scope management. the earned value has provided methods for predicting the cost for projects. in large part, these methods have not been improved upon since their beginnings and remain unsubstantiated as to accuracy. in this direction, several mathematics formulas have been d...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

a case study of the two translators of the holy quran: tahereh saffarzadeh and laleh bakhtiar

بطورکلی، کتاب های مقدسی همچون قران کریم را خوانندگان میتوان مطابق با پیش زمینه های مختلفی که درند درک کنند. محقق تلاش کرده نقش پیش زمینه اجتماعی-فرهنگی را روی ایدئولوژی های مترجمین زن و در نتیجه تاثیراتش را روی خواندن و ترجمه آیات قرآن کریم بررسی کند و ببیند که آیا تفاوت های واژگانی عمده ای میان این مترجمین وجود دارد یا نه. به این منظور، ترجمه 24 آیه از آیات قرآن کریم مورد بررسی مقایسه ای قرار ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Fondasi: Jurnal Teknik Sipil

سال: 2023

ISSN: ['2302-4976', '2503-1511']

DOI: https://doi.org/10.36055/fondasi.v12i1.19559