Analysis on Dust Control Technology in Open-pit Quarry
نویسندگان
چکیده
منابع مشابه
Analysis of Large-scale Displacement Using Radar Interferometry Technology in Open-pit Mines (Case Study: Gol Gohar Sirjan Mine)
Abstract Mines with their displacements cause damage to infrastructure and land, so it is important to control the displacement caused by mines. Also, the amount of minerals extracted from mines has always been of interest to managers. On the other hand, radar interferometry, given the production of repetitive and full images and the acceptable accuracy of this method, in examining be sugge...
متن کاملExperimental Investigation on Self Compacting Concrete Using Quarry Dust
This study presents an experimental investigation on self-compacting concrete (SCC) with fine aggregate (sand) replacement of a Quarry Dust (QD) (0%, 25%, 50%, 75%, 100%) and addition of mineral admixtures like Fly Ash (FA) and Silica Fume (SF) & chemical admixtures like super plasticizers (SP). After each mix preparation, 45 cubes specimens and 45 cylinders specimens are cast and cured. The sp...
متن کاملAn Approach to Locate an in Pit Crusher in Open Pit Mines
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....
متن کاملDetermination of the largest pit with the non-negative net profit in the open pit mines
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...
متن کاملOpen pit limit optimization using dijkstra’s algorithm
In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Energy and Natural Resources
سال: 2021
ISSN: 2330-7366
DOI: 10.11648/j.jenr.20211001.13