Analyzing uncertainties in model response using the point estimate method: Applications from railway asset management
نویسندگان
چکیده
منابع مشابه
Placement and Sizing of Various Renewable Generations in Distribution Networks with Consideration of Generation Uncertainties using Point Estimate Method
Abstract: Deploying Distributed Generation (DG) units has increased due to yearly increase of electric energy demand and technological advancements beyond Smart Grid. Although, DGs offer several advantages such as reducing economic costs and environmental impacts, the operation of these units in power systems creates several problems. In this paper, optimal allocation and sizing of DG units in ...
متن کاملA stochastic model for railway track asset management
The determination of the strategy to ensure that the geometry for railway track is kept within acceptable limits, in a cost effective manner, is a complex process. It requires the simultaneous consideration of the activities which govern inspection, maintenance and renewal. In addition to this the geometry degradation process is dependent upon the maintenance history. The condition where the tr...
متن کاملshort term scheduling of a virtual power plant in a day-ahead market under uncertainties using point estimate method
abstract: enviromental concerns, improvements in renewable energy technologies, governmental incentives for the use of these resources, and increased t&d; costs, are the main factors driving the energy sector into a new era, where considerable portions of electrical demand will be met through widespread installation of distributed energy resources (ders). the virtual power plant (vpp) is a dece...
متن کاملbuckling of viscoelastic composite plates using the finite strip method
در سال های اخیر، تقاضای استفاده از تئوری خطی ویسکوالاستیسیته بیشتر شده است. با افزایش استفاده از کامپوزیت های پیشرفته در صنایع هوایی و همچنین استفاده روزافزون از مواد پلیمری، اهمیت روش های دقیق طراحی و تحلیل چنین ساختارهایی بیشتر شده است. این مواد جدید از خودشان رفتارهای مکانیکی ارائه می دهند که با تئوری های الاستیسیته و ویسکوزیته، نمی توان آن ها را توصیف کرد. این مواد، خواص ویسکوالاستیک دارند....
Optimal operation management of microgrids using the point estimate method and firefly algorithm while considering uncertainty
This paper analyzes the behavior of Hong’s point estimate method to account for uncertainties in probabilistic energy management systems to optimize the operation of a microgrid (MG). These uncertainties may arise from different sources, such as the market prices, load demands, and electric power generation of wind farms and photovoltaic systems. Point estimate methods constitute a remarkable t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability
سال: 2019
ISSN: 1748-006X,1748-0078
DOI: 10.1177/1748006x19825593