Application of ERA-Interim Reanalysis Data for Onshore and Offshore Wind Resource Assessment
نویسندگان
چکیده
منابع مشابه
On the Use of Reanalysis Data for Wind Resource Assessment
by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.
متن کاملWave energy resource of Brazil: An analysis from 35 years of ERA-Interim reanalysis data
This paper presents a characterization of the wave power resource and an analysis of the wave power output for three (AquaBuoy, Pelamis and Wave Dragon) different wave energy converters (WEC) over the Brazilian offshore. To do so it used a 35 years reanalysis database from the ERA-Interim project. Annual and seasonal statistical analyzes of significant height and energy period were performed, a...
متن کاملERA-Interim/Land: a global land surface reanalysis data set
ERA-Interim/Land is a global land surface reanalysis data set covering the period 1979–2010. It describes the evolution of soil moisture, soil temperature and snowpack. ERA-Interim/Land is the result of a single 32-year simulation with the latest ECMWF (European Centre for MediumRange Weather Forecasts) land surface model driven by meteorological forcing from the ERA-Interim atmospheric reanaly...
متن کاملdiagnostic and developmental potentials of dynamic assessment for writing skill
این پایان نامه بدنبال بررسی کاربرد ارزیابی مستمر در یک محیط یادگیری زبان دوم از طریق طرح چهار سوال تحقیق زیر بود: (1) درک توانایی های فراگیران زمانیکه که از طریق برآورد عملکرد مستقل آنها امکان پذیر نباشد اما در طول جلسات ارزیابی مستمر مشخص شوند; (2) امکان تقویت توانایی های فراگیران از طریق ارزیابی مستمر; (3) سودمندی ارزیابی مستمر در هدایت آموزش فردی به سمتی که به منطقه ی تقریبی رشد افراد حساس ا...
15 صفحه اولSynthetic Aperture Radar for Offshore Wind Resource Assessment and Wind Farm Development in the UK
The UK has an abundant offshore wind resource with offshore wind set to grow rapidly over the coming years. Optimisation of energy production is of the utmost importance given the high installation and maintenance costs of offshore turbines; accurate estimates of wind speed characteristics are critical during the planning process. While operational assessment methods which rely upon in-situ obs...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Korean Solar Energy Society
سال: 2017
ISSN: 1598-6411,2508-3562
DOI: 10.7836/kses.2017.37.2.001