Applying a Hybrid MCDM Model for Six Sigma Project Selection
نویسندگان
چکیده
منابع مشابه
A hybrid MCDM model for strategic vendor selection
Proposed in this study is a hybrid model for supporting the vendor selection process in new task situations. First, the vendor evaluation problem is formulated by the combined use of the multi-criteria decision-making (MCDM) approach and a proposed five-step hybrid process, which incorporates the technique of an analytic network process (ANP). Then the modified TOPSIS (technique for order perfo...
متن کاملAn integrated analytic approach for Six Sigma project selection
Six Sigma is regarded as a well-structured methodology for improving the quality of processes and products. It helps achieve the company’s strategic goal through the effective use of project-driven approach. As Six Sigma is a project-driven methodology, it is essential to prioritize projects which provide maximum financial benefits to the organization. Generating and prioritizing the critical S...
متن کاملVendor Selection: An Enhanced Hybrid Fuzzy MCDM Model
The objective of this article is to develop an empirically based framework for formulating and selecting a vendor in supply chain. This study applies the fuzzy set theory to evaluate the vendor selection decision. Applying Analytic Hierarchy Process (AHP) in obtaining criteria weights and applied Technique for Order Performance by Similarity to Idea Solution (TOPSIS) for obtaining final ranking...
متن کاملA Grey-Based Fuzzy ELECTRE Model for Project Selection
Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2014
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2014/730934