Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman
نویسندگان
چکیده
منابع مشابه
the effect of taftan pozzolan on the compressive strength of concrete in the environmental conditions of oman sea (chabahar port)
cement is an essential ingredient in the concrete buildings. for production of cement considerable amount of fossil fuel and electrical energy is consumed. on the other hand for generating one tone of portland cement, nearly one ton of carbon dioxide is released. it shows that 7 percent of the total released carbon dioxide in the world relates to the cement industry. considering ecological issu...
A framework for financial autonomy in universities applying Interpretive Structural Modeling (ISM) technique
The purpose of this study was to provide a framework for financial autonomy of public universities in Tehran with qualitative approach. Due to the limited size of the population, purposive sampling was performed in which 20 experts with experience in the field of university financial management were selected. Semi-structured interviews were used to collect the required data. To achieve the goal...
متن کاملProbability distribution fitting of schedule overruns in construction projects
The probability of schedule overruns for construction and engineering projects can be ascertained using a ‘best fit’ probability distribution from an empirical distribution. The statistical characteristics of schedule overruns occurring in 276 Australian construction and engineering projects were analysed. Skewness and kurtosis values revealed that schedule overruns are non-Gaussian. Theoretica...
متن کاملfrom linguistics to literature: a linguistic approach to the study of linguistic deviations in the turkish divan of shahriar
chapter i provides an overview of structural linguistics and touches upon the saussurean dichotomies with the final goal of exploring their relevance to the stylistic studies of literature. to provide evidence for the singificance of the study, chapter ii deals with the controversial issue of linguistics and literature, and presents opposing views which, at the same time, have been central to t...
15 صفحه اولSignificant Factors Causing Cost Overruns in Large Construction Projects in Malaysia
Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Journal of Engineering Research [TJER]
سال: 2015
ISSN: 1726-6742,1726-6009
DOI: 10.24200/tjer.vol12iss1pp53-68