Assessing the Early Bird Heuristic (for Predicting Project Quality)
نویسندگان
چکیده
Before researchers rush to reason across all available data or try complex methods, perhaps it is prudent first check for simpler alternatives. Specifically, if the historical has most information in some small region, a model learned from that region would suffice rest of project. To support this claim, we offer case study with 240 projects, where find those projects “clumps” towards earliest parts A quality prediction just 150 commits works as well, better than state-of-the-art Using ”early bird” data, can build models very quickly and early project life cycle. Moreover, using bird method, have shown simple (with few features) generalizes hundreds projects. Based on experience, doubt prior work generalizing may needlessly complicated an inherently process. Further, focused later-life cycle needs be revisited since their conclusions were drawn relatively uninformative regions. Replication note: our scripts are here: https://github.com/snaraya7/early-bird
منابع مشابه
A Heuristic Model for Predicting Bankruptcy
Bankruptcy prediction is one of the major business classification problems. The main purpose of this study is to investigate Kohonen self-organizing feature map in term of performance accuracy in the area of bankruptcy prediction. A sample of 108 firms listed in Tehran Stock Exchange is used for the study. Our results confirm that Kohonen network is a robust model for predicting bankruptcy in ...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...
متن کاملPredicting bird song from space
Environmentally imposed selection pressures are well known to shape animal signals. Changes in these signals can result in recognition mismatches between individuals living in different habitats, leading to reproductive divergence and speciation. For example, numerous studies have shown that differences in avian song may be a potent prezygotic isolating mechanism. Typically, however, detailed s...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: ACM Transactions on Software Engineering and Methodology
سال: 2023
ISSN: ['1049-331X', '1557-7392']
DOI: https://doi.org/10.1145/3583565