Asymptotic Delay Analysis for Cross-Layer Delay-Based Routing in Ad Hoc Networks
نویسندگان
چکیده
منابع مشابه
Asymptotic Delay Analysis for Cross-Layer Delay-Based Routing in Ad Hoc Networks
This paper addresses the problem of the evaluation of the delay distribution via analytical means in IEEE 802.11 wireless ad hoc networks. We show that the asymptotic delay distribution can be expressed as a power law. Based on the latter result, we present a cross-layer delay estimation protocol and we derive new delay distribution based routing algorithms, which are well adapted to the QoS re...
متن کاملCluster Based Cross Layer Intelligent Service Discovery for Mobile Ad-Hoc Networks
The ability to discover services in Mobile Ad hoc Network (MANET) is a major prerequisite. Cluster basedcross layer intelligent service discovery for MANET (CBISD) is cluster based architecture, caching ofsemantic details of services and intelligent forwarding using network layer mechanisms. The cluster basedarchitecture using semantic knowledge provides scalability and accuracy. Also, the mini...
متن کاملCross Layer Using End-to-end Delay Assessment for Routing Protocol in Vehicular Ad Hoc Network
The moving with fast velocity of each node in vehicular ad hoc network (VANET) results in the existence transient communication links, which degrade the performance of developed protocols. Established routes frequently become invalid, and existing communication flows are interrupted, incurring delay and additional overhead. In this paper we use cross layer approach solving these problems. First...
متن کاملDelay-Oriented Routing Protocol for Wireless Ad Hoc Networks
In wireless ad hoc mobile network, a host desires to communicate with another host may need some intermediate nodes to relay data packets. To maximize the channel resource utilization and minimize the network transfer delay along the path, the shortest path with minimum hops approach is often adapted. However, by considering the employing medium access control (MAC) protocol, the minimum transf...
متن کاملAsymptotic Delay Analysis and Timeout-Based Admission Control for Ad Hoc Wireless Networks
In this paper, we present an analytical model for an approximate calculation of the end-to-end delay performance in multi-hop wireless ad hoc networks. In contrast to literature that largely focuses on average delay, our paper focuses on the distribution of end-to-end delay. In this paper, we assume that each source injects packets in the network, which traverse intermediate nodes until they re...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in Multimedia
سال: 2007
ISSN: 1687-5680,1687-5699
DOI: 10.1155/2007/90879