Łazienkowski Bridge Fire in Warsaw – Structural Damage and Restoration Method
نویسندگان
چکیده
منابع مشابه
Damage Detection of Bridge by Rayleigh-Ritz Method
As a result of environmental and accidental actions, damage occurs in structures. The early detection of any defect can be achieved by regular inspection and condition assessment. In this way, the safety and reliability of structures can be increased. This paper is devoted to propose a new and effective method for detecting, locating, and quantifying beam-like structures. This method is based o...
متن کاملMemristor Bridge Synapse Application for Integrate and Fire and Hodgkin-Huxley Neuron Cell
Memory resistor or memristor is already fabricated successfully using current nano dimension technology. Based on its unique hysteresis, the amount of resistance remains constant over time, controlled by the time, the amplitude, and the polarity of the applied voltage. The unique hysteretic current-voltage characteristic in the memristor causes this element to act as a non-volatile resistive me...
متن کاملQuick earthquake damage detection method for bridge structures
When an extreme earthquake occurs, it is essential to detect the severe structural damage that affect the structural safety immediately. This paper proposes a method for quick earthquake damage detection/evaluation of reinforced concrete bridge columns. An intelligent sensor unit is developed that captures changes in the natural period of a bridge column by FFT of response acceleration recorded...
متن کاملA Damage Diagnosis Method for Bridge Damage Based on Improved R-ARX Model
In this study, we focused mainly on establishing a new sensitive method to identify location of damages in Service Bridge. The improved method of combination of Autoregressive models (AR) and autoregressive models with exogenous inputs (ARX) was applied to identify the damage in Service Bridge. Firstly, an improved AR-ARX model was established for damage identification of bridge on service. Sec...
متن کاملFire and Reconstruction at Lobato Bridge in New Mexico
historic preservation. resulted in the D&RG abandoning the goal of building south to El Paso and focusing instead on building west to the mining camps of Leadville, Colorado, and the San Juan Mountains of southwest Colorado.4 In 1879 reconnaissance surveying was conducted, and contracts were let for the construction of the San Juan Extension. By April 1880 service was extended from Alamosa, Col...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Archives of Civil Engineering
سال: 2016
ISSN: 1230-2945
DOI: 10.1515/ace-2015-0104