Basic Study for Development of Risk Based Bridge Maintenance Priority Decision Model

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing a model for simulating urban expansion based on the concept of decision risk: A case study in Babol city

Today, the study of the spatial-temporal pattern of urban physical expansion and the identification of the parameters affecting the expansion play a crucial role in urban-related decision-making and long-term planning processes. Consequently, the use of precise and efficient methods to predict the physical expansion of urban areas is of great importance. The objective of present study is to pro...

متن کامل

Preventive Maintenance Scheduling: Decision Model Development and Case Study Analysis

In this work, the effectiveness of preventive maintenance scheduling (PMS) decisions was reported based on a techno-economic model that reflects cost objective function for ship maintenance activities. With a potential to impact on both transportation businesses and users of transportation services, the model provides an alternative to the combined classical literature problems of spare-parts i...

متن کامل

Maintenance management decision model for preventive maintenance strategy on production equipment

In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...

متن کامل

Bi-level Model for Reliability based Maintenance and Job Scheduling

Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...

متن کامل

Development of Average Model for Control of a Full Bridge PWM DC-DC Converter

This paper presents a detailed small-signal and transient analysis of a full bridge PWM DC-DC converter designed for high voltage, high power applications using an average model. The derived model is implemented in a typical system and used to produce the small-signal and transient characteristics of the converter. Results obtained in the analysis of the high voltage and high power design examp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Korean Journal of Construction Engineering and Management

سال: 2017

ISSN: 2005-6095

DOI: 10.6106/kjcem.2017.18.2.108