Best selection of project portfolio using Fuzzy AHP and Fuzzy TOPSIS
نویسندگان
چکیده
منابع مشابه
Project Selection by Using Fuzzy AHP and TOPSIS Technique
In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...
متن کاملSelection of the Best Material for an Axle in Motorcycle using fuzzy AHP and Fuzzy TOPSIS Methods
Amit Sharma Assistant Professor Department of Mechanical Engg. HIT, Bahadurgarh, Haryana, INDIA [email protected] Atul Sharma Assistant Professor Department of Mechanical Engg. MIT, Moradabad, U.P., INDIA [email protected] Dr. Anish Sachdeva Associate Professor Department of Industrial and Production Engineering National Institute of Technology, Jalandhar, Punjab, INDIA anishsachdeva...
متن کاملA fuzzy hybrid project portfolio selection method using Data Envelopment Analysis, TOPSIS and Integer Programming
Project selection and resource allocation are critical issues in project-based organizations. These organizations are required to plan, evaluate, and control their projects in accordance with the organizational mission and objectives. In this study, we propose a three-stage hybrid method for selecting an optimal combination of projects. We obtain the maximum fitness between the final selection ...
متن کاملProject Selection by Constrained Fuzzy AHP
The selection of a project among a set of possible alternatives is a difficult task decision makers have to face. Difficulties in selecting a project arise because of the different goals involved and because of the large number of attributes to consider. Our approach is based upon a fuzzy extension of the Analytic Hierarchy Process (AHP). This paper focuses on the constraints that have to be co...
متن کاملProject Selection by Using a Fuzzy TOPSIS Technique
Selection of a project among a set of possible alternatives is a difficult task that the decision maker (DM) has to face. In this paper, by using a fuzzy TOPSIS technique we propose a new method for a project selection problem. After reviewing four common methods of comparing investment alternatives (net present value, rate of return, benefit cost analysis and payback period) we use them as cri...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Engineering Management and Competitiveness
سال: 2018
ISSN: 2334-9638,2217-8147
DOI: 10.5937/jemc1801003a