Bi-objective supply chain problem using MOPSO and NSGA-II ,

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimizing a multi-product closed-loop supply chain using NSGA-II, MOSA, and MOPSO meta-heuristic algorithms

This study aims to discuss the solution methodology for a closed-loop supply chain (CLSC) network that includes the collection of used products as well as distribution of the new products. This supply chain is presented on behalf of the problems that can be solved by the proposed meta-heuristic algorithms. A mathematical model is designed for a CLSC that involves three objective functions of ma...

متن کامل

Optimization to Manage Supply Chain Disruptions Using the NSGA-II

Disruption on a supply chain provokes lost that should be minimized looking for alternative suppliers. This solution involves a strategy to manage the impact of the disruption and thus to recuperate the supply chain. Difficulty of the management is the diversity of involved factors such that turns complex to provide or choice a solution among the possible ones. Depending on the objective(s) to ...

متن کامل

Bi-objective Build-to-order Supply Chain Problem with Customer Utility

Taking into account competitive markets, manufacturers attend more customer’s personalization. Accordingly, build-to-order systems have been given more attention in recent years. In these systems, the customer is a very important asset for us and has been paid less attention in the previous studies. This paper introduces a new build-to-order problem in the supply chain. This study focuses on bo...

متن کامل

Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: NSGA-II and NRGA

Bi-objective optimization of a multi-product multi-period three-echelon supply-chain-network problem is aimed in this paper. The network consists of manufacturing plants, distribution centers (DCs), and customer nodes. To bring the problem closer to reality, the majority of the parameters in this network including fixed and variable costs, customer demand, available production time, set-up and ...

متن کامل

A Bi-objective Mathematical Model for Closed-loop Supply Chain Network Design Problem

In this paper, a bi-objective mixed-integer linear optimization model for Closed-loop Supply Chain Network Design Problem (CLSCND) is developed. The proposed model includes both the forward and reverse directions and includes different types of facilities, namely, manufacturing/remanufacturing centers, warehouses, and disassembly centers. The first objective function tried to minimize the total...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: international journal of industrial engineering computations

سال: 2012

ISSN: 1923-2926,1923-2934

DOI: 10.5267/j.ijiec.2012.02.003