Bicriteria problem of discrete optimization in planning a multiunit construction project

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Algorithm robust for the bicriteria discrete optimization problem

Multiple vector optimization proposes to optimize a vector-valued function rather than a real-valued one. The motivation of that is quite natural, since most of the real-life problems involve more than one measure to be used as objective function. Multiple objective discrete optimization (MODO) problem is defined as minx∈X f(x) = [f1(x), . . . fp(x)] T , where X ⊆ R is a bounded (discrete) set ...

متن کامل

solution of security constrained unit commitment problem by a new multi-objective optimization method

چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...

Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Optimal Construction Project Planning

The nature of the construction industry combined with the lack of appropriate techniques and technologies suitable for construction work are among the main reasons for inadequate industry performance. Researchers need to develop a better understanding of the construction industry and develop approaches and technologies that will enable construction companies to do a better job in estimating, pl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MATEC Web of Conferences

سال: 2018

ISSN: 2261-236X

DOI: 10.1051/matecconf/201817404008