BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management
نویسندگان
چکیده
منابع مشابه
BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management
Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM)-integrated simulation framework fo...
متن کاملA BIM-integrated approach to Construction Quality Management
....................................................................................................................................................... 7
متن کاملA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
متن کاملA REVIEW ON SEQUENCING APPROACHES FOR MIXED-MODEL JUST-IN-TIME PRODUCTION SYSTEM
Research interests have been focused on the concept of penalizing jobs both for being early and for being tardy because not only of modern competitive industrial challenges of providing a variety of products at a very low cost by smoothing productions but also of its increasing and exciting computer applications. Here, sequencing approaches of the mixed- model just-in-time production systems is...
متن کاملBIM functions for optimized construction management in civil engineering
Purpose The aim of this study is to suggest configuration methodologies of active building information model (BIM) functions that enable to practically control limitations by optimizing schedule overlapping linked to its space models after analyzing workspace conflict analysis for a bridge model. This study also suggests development methodologies of active BIM-functions, linking an optimized me...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2016
ISSN: 2071-1050
DOI: 10.3390/su8111106