Birnbaum importance analysis of supply chain fault risks based on binary decision diagram

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An ordering heuristic to develop the binary decision diagram based on structural importance

Fault tree analysis is often used to assess risks within industrial systems. The technique is commonly used although there are associated limitations in terms of accuracy and efficiency when dealing with large fault tree structures. The most recent approach to aid the analysis of the fault tree diagram is the Binary Decision Diagram (BDD) methodology. To utilise the technique the fault tree str...

متن کامل

An ordering heuristic to develop the binary decision diagram based on structural importance

Fault tree analysis is often used to assess risks within industrial systems. The technique is commonly used although there are associated limitations in terms of accuracy and efficiency when dealing with large fault tree structures. The most recent approach to aid the analysis of the fault tree diagram is the Binary Decision Diagram (BDD) methodology. To utilise the technique the fault tree str...

متن کامل

Event-based Approach for Supply Chain Fault Analysis

This work is a contribution to fault propagation analysis in a supply chain network. An event-based fault detection method is applied to fault propagation analysis validation. The goal of this methodology is to discover and validate fault propagation effects on system variables. This knowledge could be used to improve corrective action design in order to compensate negative effects. The methodo...

متن کامل

Research on Supply Chain Risks Management by Simulation Analysis

Today’s supply chains characterize as high uncertainty, high customer expectations, and high vulnerability. Supply chain risk management (SCRM) has been an important area of supply chain management. Internal risks resulted from the interaction among supply chain members act as the major impact on supply chain coordination, but they are difficult to be modeled and analyzed if using traditional m...

متن کامل

Prioritization of Supply Chain Risks in Automotive Industry

Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Manufacturing

سال: 2019

ISSN: 2351-9789

DOI: 10.1016/j.promfg.2019.02.016