Blocking and Delay Analysis of Single Wavelength Optical Buffer With General Packet Size Distribution
نویسندگان
چکیده
منابع مشابه
Analysis of a single-wavelength optical buffer
We present a detailed analysis of the loss performance in an optical buffer having access to a single outgoing channel. Such a system consisting of a number of fiber delay lines differs significantly from a conventional electronic buffer, in that only a discrete set of delays can be realized for contention resolution. This leads to an underutilization of the channel capacity, which reduces over...
متن کاملAsymptotic analysis for blocking probabilities of optical buffer with general packet-length distributions
Asynchronous optical packet switching seems to be suitable as a transport technology for the next-generation Internet due to the variable lengths of IP packets. Optical buffers in the output port are an integral part for solving contention by exploiting the time domain. Fiber delay lines (FDLs) are a well-known technique for achieving optical buffers. This work aims to give a highly accurate ap...
متن کاملExact Performance Analysis of a Single-wavelength Optical Buffer with Correlated Inter-arrival Times
Providing a photonic alternative to the current electronic switching in the backbone, optical packet switching (OPS) and optical burst switching (OBS) require optical buffering. Optical buffering exploits delays in long optical fibers; an optical buffer is implemented by routing packets through a set of fiber delay lines (FDLs). Previous studies pointed out that, in comparison with electronic b...
متن کاملWavelength allocation in an optical switch with a fiber delay line buffer and limited-range wavelength conversion
This paper presents an approach to evaluate the performance of an optical switch equipped with both limited-range wavelength conversion and Fiber Delay Lines to resolve contention. We propose an analytical model that allows a general behavior for the packet size distribution while the inter-arrival times are assumed to be of Phase-Type and can easily be relaxed to be generally distributed if ne...
متن کاملAnalysis of an Asynchronous Single-Wavelength FDL Buffer
We investigate the behaviour of an asynchronous single-wavelength fiber delay line (FDL) buffer by means of a continuous-time queueing model. Through a limit procedure, previously obtained results for a discrete-time queueing model are translated to a continuous-time setting. The two important cases of exponentially distributed burst sizes and deterministic burst sizes are discussed in detail. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Lightwave Technology
سال: 2009
ISSN: 0733-8724
DOI: 10.1109/jlt.2008.2004951