Calcein staining of calcified structures in pearl oyster Pinctada margaritifera and the effect of food resource level on shell growth
نویسندگان
چکیده
منابع مشابه
Temperature and Food Influence Shell Growth and Mantle Gene Expression of Shell Matrix Proteins in the Pearl Oyster Pinctada margaritifera
In this study, we analyzed the combined effect of microalgal concentration and temperature on the shell growth of the bivalve Pinctada margaritifera and the molecular mechanisms underlying this biomineralization process. Shell growth was measured after two months of rearing in experimental conditions, using calcein staining of the calcified structures. Molecular mechanisms were studied though t...
متن کاملDetermination of Gender in the Pearl Oyster Pinctada margaritifera
The pearl industry in French Polynesia is based on exploitation of natural stocks of the blacklip pearl oyster (Pinctada margaritifera). It generates an annual turnover of €90 million. Improvements in pearl quality need genetic studies to improve the populations. This pearl oyster is a protandric species, in which the sex ratio normally is biased toward males. There is an increasing interest in...
متن کاملEffect of temperature, food availability, and estradiol injection on gametogenesis and gender in the pearl oyster Pinctada margaritifera.
The black-lip pearl oyster Pinctada margaritifera is a protandrous hermaphrodite species. Its economic value has led to the development of controlled hatchery reproduction techniques, although many aspects remain to be optimized. In order to understand reproductive mechanisms and their controlling factors, two independent experiments were designed to test hypotheses of gametogenesis and sex rat...
متن کاملthe effect of authentic listening materials on the listening proficiency of efl learners in the intermediate level
having conducted the experiment and analysed the data, the researcher computed the groups mean scores and variances for the test relating to the research question. as the final atep, a t-test was conodonted for the hypothesis. as noted earlier, the significance level was determined at .05 and .01 respectively. the observed t-value was higher than the critical t-value at. 5 and .01 levels. conse...
15 صفحه اولEvaluation of selected substrates for collection of hatchery reared black-lip pearl oyster (Pinctada margaritifera) spat
An experiment was conducted to investigate the effect of collector materials and position on Pinctada margaritifera spat attachment. Settlement on polyethylene pipes (54.6%) was significantly higher (P < 0.05) than on plastic baskets (25%). Significantly higher (P < 0.05) spat catch was recorded from the collectors which were installed on lower height of settlement tank than upper. The number o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Aquaculture
سال: 2011
ISSN: 0044-8486
DOI: 10.1016/j.aquaculture.2011.01.008