CALCULATION OF CHANGE ORDER FOR ROAD PROJECTS IN JAKARTA

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

study of cohesive devices in the textbook of english for the students of apsychology by rastegarpour

this study investigates the cohesive devices used in the textbook of english for the students of psychology. the research questions and hypotheses in the present study are based on what frequency and distribution of grammatical and lexical cohesive devices are. then, to answer the questions all grammatical and lexical cohesive devices in reading comprehension passages from 6 units of 21units th...

Valuing Government Guarantees in Toll Road Projects

The participation of private capital in public infrastructure investment projects has been sought by many governments who perceive this as a way to overcome budgetary constraints and foster economic growth. For some types of projects, this investment may require government participation in the form of project guarantees in order to reduce the risk of the private investor. As a consequence, the ...

متن کامل

Reducing Light Change Effects in Automatic Road Detection

Automatic road extraction from aerial images can be very helpful in traffic control and vehicle guidance systems. Most of the road detection approaches are based on image segmentation algorithms. Color-based segmentation is very sensitive to light changes and consequently the change of weather condition affects the recognition rate of road detection systems. In order to reduce the light change ...

متن کامل

Reducing Light Change Effects in Automatic Road Detection

Automatic road extraction from aerial images can be very helpful in traffic control and vehicle guidance systems. Most of the road detection approaches are based on image segmentation algorithms. Color-based segmentation is very sensitive to light changes and consequently the change of weather condition affects the recognition rate of road detection systems. In order to reduce the light change ...

متن کامل

(revitalizing silk road corridor in the region (north east of iran

introruction khawf in(iran)-herat and mazaresharif and shirkhan bandar in (afghanistan)-dushanbe in (tajikistan)_(kirgizstan)-kashghar in(china) project railway network is under construction that it is as a significant corridor for revitalizing silk road corridor in the region .at the present there are three different gauge in the region central asia with 1,520 mm gauge and turkey-islamic repu...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2020

ISSN: 1757-899X

DOI: 10.1088/1757-899x/1007/1/012001