Calculation of the Integrated Squared Error for Systems with Time Lag
نویسندگان
چکیده
منابع مشابه
Learning principal directions: Integrated-squared-error minimization
A common derivation of principal component analysis (PCA) is based on the minimization of the squared-error between centered data and linear model, corresponding to the reconstruction error. In fact, minimizing the squared-error leads to principal subspace analysis where scaled and rotated principal axes of a set of observed data, are estimated. In this paper, we introduce and investigate an al...
متن کاملa time-series analysis of the demand for life insurance in iran
با توجه به تجزیه و تحلیل داده ها ما دریافتیم که سطح درامد و تعداد نمایندگیها باتقاضای بیمه عمر رابطه مستقیم دارند و نرخ بهره و بار تکفل با تقاضای بیمه عمر رابطه عکس دارند
the effects of error correction methods on pronunciation accuracy
هدف از انجام این تحقیق مشخص کردن موثرترین متد اصلاح خطا بر روی دقت آهنگ و تاکید تلفظ کلمه در زبان انگلیسی بود. این تحقیق با پیاده کردن چهار متد ارائه اصلاح خطا در چهار گروه، سه گروه آزمایشی و یک گروه تحت کنترل، انجام شد که گروه های فوق الذکر شامل دانشجویان سطح بالای متوسط کتاب اول passages بودند. گروه اول شامل 15، دوم 14، سوم 15 و آخرین 16 دانشجو بودند. دوره مربوطه به مدت 10 هفته ادامه یافت و د...
15 صفحه اولthe effect of task cognitive complexity and time limit on the performance of the learners with different proficiency levels in second language writing skill
this study investigated the effects of manipulating the cognitive complexity of tasks along +/- few elements and the time limits on l2 learners writing performance. to conduct the study, 60 iranian efl learners with two levels of proficiency, low and high intermediate, were selected and assigned to three groups based on the time devoted to task completion. the participants performed both a simp...
15 صفحه اولError Squared Control
I am frequently asked to visit offshore production platforms to sort out problems with the oil export or the produced water quality where the ultimate issue is not poor control in the export or water-handling systems but due to over-aggressive level control at the reception end of the process. One of the tools available to decouple the front and back ends of the production train is error square...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transactions of the Society of Instrument and Control Engineers
سال: 1970
ISSN: 0453-4654
DOI: 10.9746/sicetr1965.6.546