Campus girds for lean times

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ontology-based Virtual Data Integration for E-Science Girds

For scientific collaboration, sharing data between different parties is fundamental. Grids, originally developed for high-performance and parallel computing, enable the sharing of distributed resources across institutional boundaries by providing a security infrastructure and standardized Grid-services. Because data is usually stored in different information systems and schemes, at the moment t...

متن کامل

Using lean methods to improve OR turnover times.

were experiencing difficulty meeting OR turnover goals. Extended turnovers increased patient and physician wait times and disrupted flow in the OR suite. The team averaged 20 minutes to complete room turnovers, and in some observed cases, they required 25 minutes. Absent personnel, missing supplies , delayed delivery of the patient to the OR, and undefined responsibilities were just a few of th...

متن کامل

Leveraging local funds to expand coverage in lean times.

"Lean times" is the phrase that defines most states' current budget environments. State revenue estimates for fiscal year 2002 continue to be revised downward, and the outlook for fiscal year 2003 is generally pessimistic. In these tight budgetary times, many states have made, or are considering making, cuts in state health care spending. One way to reduce spending and the number of uninsured i...

متن کامل

Bust economics: foragers choose high quality habitats in lean times

In environments where food resources are spatially variable and temporarily impoverished, consumers that encounter habitat patches with different food density should focus their foraging initially where food density is highest before they move to patches where food density is lower. Increasing missed opportunity costs should drive individuals progressively to patches with lower food density as ...

متن کامل

Lean six sigma process improvement in specimen receiving to improve stat chemistry turnaround times

  Objective: As a consequence of stat turnaround times (TATs) chronically exceeding 60 minutes, our laboratory was facing pressure to divert limited resources toward the implementation of an emergency department satellite laboratory. Peer-reviewed literature in clinical laboratory quality assurance and improvement indicates that between 60-70% of errors occur at the pre-analytical level.  Thus...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Nature

سال: 2013

ISSN: 0028-0836,1476-4687

DOI: 10.1038/494019a