Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups

In production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution includes more than one batch of the same product in a single period — in other words, at least one sub tour exists in the production sequence of that ...

متن کامل

An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups

This paper presents a novel mathematical programming approach to the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and setup costs. The approach is partly based on the earlier work of Haase and Kimms [2000. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of ...

متن کامل

LTO Heuristics for Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes

The wellknown CLSP problem is generalized including sequence dependent setup times and overtimes and modeling it as a quadratic mixed 0-1 integer programming problem called Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes. We develop a heuristics based on Lagrangean relaxation and tabu search for solving the problem. At the end, some computational results are presented.

متن کامل

Lot Sizing and Scheduling in Flow Shop with Sequence-Dependent Setups and Backlogging

Lot sizing and scheduling in flow shop has been considered in this paper. Our study includes a multi-level and multi-period capacitated lot sizing and scheduling problem (CLSP) with sequence-dependent setups, setups carry over in flow shop. In manufacturing environments backlogging is unavoidable. If the production capacity is infinite, any demand can be satisfied

متن کامل

Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups

A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally teste...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Scheduling

سال: 2010

ISSN: 1094-6136,1099-1425

DOI: 10.1007/s10951-010-0197-6