Capacity and delay analysis in delay tolerant network with multiple communities

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Delay Management in Delay Tolerant Network

In delay tolerant networks (DTN), nodes explore various opportunities to connect and communicate with each other. A series of encounters of different nodes will create such opportunities and spread a message among many nodes and eventually deliver to the designated destination. We study one common DTN scenario where the message exchanges happen when nodes meet others at certain locations. In th...

متن کامل

Delay analysis of two-hop network-coded delay-tolerant networks

In this paper, we study the block delivery delay of random linear network coding in two-hop single-unicast delay-tolerant networks with grid-based mobility. By block delivery delay, we mean how long it takes the destination to receive all the K information packets of a single block. Our work includes two parts. First, we give a general analysis of the dependency between packet spaces spanned by...

متن کامل

Social Delay-Tolerant Network Routing

Routing in mobile delay-tolerant networks faces new challenges such as mobility and the dynamic nature of the network. Social network information may be useful for routing since mobile nodes in the same social network may be encountered more often and thus be more successful at message-passing. Collecting this social network information, however, can be challenging. We compare a social network ...

متن کامل

Participate in Mobile Delay Tolerant Network Routing

Message routing in mobile delay tolerant networks inherently relies on the cooperation between nodes. In most existing routing protocols, the participation of nodes in the routing process is taken as granted. However, in reality, nodes can be unwilling to participate. We first show in this paper the impact of the unwillingness of nodes to participate in existing routing protocols through a set ...

متن کامل

Flooding Attack in Delay Tolerant Network

Delay Tolerant Network (DTN) routing protocols works in an environment where there is no guarantee of end to end path between source and destination. DTNs operate with the principle of store, carry and forward. Mobile nodes have limited buffer space and contact opportunity. So the resources are useful and must be used optimally. The routing protocol message replication strategies react differen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Information Processing Letters

سال: 2016

ISSN: 0020-0190

DOI: 10.1016/j.ipl.2015.11.001