Capacity planning with working time accounts in services

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Capacity planning with working time accounts in services

This paper presents, formalises and classifies working time accounts (WTAs), a means of achieving flexible production capacity through the flexible organisation of working time. We propose linear programming models to plan working time, using WTA, at companies in the service industry. A computational experiment shows that the models can be solved for any planning problems of reasonable size.

متن کامل

qfd planning with cost consideration in fuzzy environment

در عصر حاضر که رقابت بین سازمان ها بسیار گسترش یافته است، مطالعه و طرحریزی سیستم های تولیدی و خدماتی به منظور بهینه سازی عملکرد آنها اجتناب ناپذیر می باشد. بخش عمده ای از رقابت پذیری سازمان ها نتیجه رضایتمندی مشتریان آنها است. میزان موفقیت سازمان های امروزی به تلاش آنها در جهت شناسایی خواسته ها و نیازهای مشتریان و ارضای این نیازها بستگی دارد. از طرفی کوتاه کردن زمان ارائه محصول/خدمات به مشتریان...

15 صفحه اول

A Continuous-Time Strategic Capacity Planning Model*

Capacity planning decisions affect a significant portion of future revenue. In the semiconductor industry, they need to be made in the presence of both highly volatile demand and long capacity installation lead-times. In contrast to traditional discrete-time models, we present a continuous-time stochastic programming model for multiple resource types and product families. We show how this appro...

متن کامل

Capacity planning and lead time management

In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities often serve as a basis to set a fixed planned lead time in an MRP-controlled environment. A major ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operational Research Society

سال: 2010

ISSN: 0160-5682,1476-9360

DOI: 10.1057/jors.2008.166