Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Case- and Constraint-Based Project Planning for Apartment Construction

ment construction project network, Hyundai Engineering and Construction and Korea Advanced Institute of Science and Technology developed a caseand constraint-based project-planning expert system for an apartment domain. The system, FASTRAK-APT, is inspired by the use of previous cases by a human expert project planner for planning a new project and the modification of these cases by the project...

متن کامل

Factors Influencing Project Delay: A Case Study of the Vale Malaysia Minerals Project (VMMP)

Delays are one of the biggest problems faced by the construction industry. Delays in construction projects have significant financial and social impact to parties involved in the projects. The main objective of this study is to explore the causes of delay in the Vale Malaysia Minerals Project (VMMP) in Lumut, Perak. This study was conducted by using a qualitative approach. A series of face to f...

متن کامل

prediction of ignition delay period in d.i diesel engines

a semi-empirical mathematical model for predicting physical part of ignition delay period in the combustion of direct - injection diesel engines with swirl is developed . this model based on a single droplet evaporation model . the governing equations , namely , equations of droplet motion , heat and mass transfer were solved simultaneously using a rung-kutta step by step unmerical method . the...

Factors associated with delay in post-exposure prophylaxis in

  Background :Although the incidence of animal bite is increasing in Iran, there is no sufficient knowledge about delayed Post-Exposure Prophylaxis (PEP). Hence, the aim of this study was to evaluate delayed PEP and its associated factors in bitten people.   Methods : This cross-sectional study was conducted in Tuyserkan district of Hamadan Province (West of Iran) from February 2011 to February...

متن کامل

Case and Constraint-Based Apartment Construction Project Planning System: FASTrak-APT

*Korea Advanced Institute of Science and Technology, **Hyundai Information Technology, Co., Ltd., ***Hyundai Engineering and Construction, Co., Ltd. *Dept. of MIS, 207-43, Cheongryang, Seoul 130-012, Korea. ** Technology Support Division, 140-2, Kye-dong, Chongro-ku, Seoul, Korea. ***Construction Management Dept., 140-2, Kye-dong, Chongro-ku, Seoul, Korea. *{leekj, jklee}@msd.kaist.ac.kr, **kim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Korea Institute of Building Construction

سال: 2011

ISSN: 1598-2033

DOI: 10.5345/jkic.2011.02.1.009