Cement-based mortar patch repair of RC columns. Comparison with all-four-sides and one-side repair

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Comparison of sealing ability of Coltozol, Portland cement, Amalgam and MTA in furcation perforations repair

Comparison of sealing ability of Coltozol, Portland cement, Amalgam and MTA in furcation perforations repair Dr. Z. Ahangari* - Dr. M. Karami** *- Associate Professor of Endodontics Dept. - Faculty of Dentistry – Shaheed Beheshti University of Medical Sciences. **- Dentist. Background and Aim: The rate of treatment success in endodontic treatment if perforation of the pulpal floor occurs, due t...

متن کامل

Comparison of nerve repair with end to end, end to side with window and end to side without window methods in lower extremity of rat

  Abstract   Background : Although, different studies on end-to-side nerve repair, results are controversial. The importance of this method in case is unavailability of proximal nerve. In this method, donor nerves also remain intact and without injury. In compare to other classic procedures, end-to-side repair is not much time consuming and needs less dissection. Overall, the previous studies i...

متن کامل

a comparison of teachers and supervisors, with respect to teacher efficacy and reflection

supervisors play an undeniable role in training teachers, before starting their professional experience by preparing them, at the initial years of their teaching by checking their work within the proper framework, and later on during their teaching by assessing their progress. but surprisingly, exploring their attributes, professional demands, and qualifications has remained a neglected theme i...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Construction and Building Materials

سال: 2018

ISSN: 0950-0618

DOI: 10.1016/j.conbuildmat.2018.07.148